| ROAD
CONSTRUCTION |
|
| DATE |
TITLE
OF THE PROJECT |
| YASİN
MOLLAOĞLU ENGINEERING LTD. COMPANY |
| 03.08.1980 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Şişli
district 2nd division road and channel construction Şişli/İstanbul |
| 23.08.1983 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Various
restoration works for art structures of 14th branch. |
| 18.l2.1983 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Bridge
and various repair works at Havsa-Uzunköprü, Meriç Bridge |
| 19.12.1983 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Various
restoration works and art structure constructions of 14 th branch. |
| 06.03.1985 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Hydraulic
art structure and wall constraction for highway and express way |
| 06.03.1985 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Chief
Engineering work in highway and expressway construction and
various works in art structures in the west junction of IZMIT |
| 06.12.1985 |
BEYOĞLU
MUNICIPALY ISTANBUL |
| Chief
engineering work in highway and expressway construction, road and
sewerege construction |
| 06.03.1986 |
BEYOĞLU
MUNICIPALY ISTANBUL |
| Road
nad sewerage contruction in municipaly region |
| 01.05.1987 |
ŞİŞLİ
MUNICIPALY ISTANBUL |
| 4th
group road construction at Gürsel District |
| 10.06.1987 |
BEYOĞLU
MUNICIPALY ISTANBUL |
| 2nd
division road and sewerage constraction in municipaly region |
| 19.08.1987 |
ŞİŞLİ
MUNICIPALY ISTANBUL |
| 3rd
group road constraction at Izzetpaşa, Çeliktepe and 19 Mayıs
Districts |
| 08.12.1987 |
ŞİŞLİ
MUNICIPALY ISTANBUL |
| 1st
group road construction at Seyrantepe, Yeşilce, Sanayi and Kuştepe
Districts |
| 23.03.1988 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
construction at Emirhan Street, Beşiktaş / ISTANBUL |
| 28.09.1988 |
KARAYOLLARI
l.BÖLGE MÜD. KÜÇÜKYALI/İST. |
| Istanbul
- Edirne Highway construction |
| 28.10.1988 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
and Sewerage construction at Emirhan street, Beşiktaş /
ISTANBUL |
| 31.12.1988 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Art
stractures at Selimpaşa junction, Kınalı Junction,
and separated road construction. |
| 29.03.1989 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
and channel construction at the 9th road Esenler, Bakırköy /
ISTANBUL |
| 07.12.1989 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
and channel construction at Atatürk Street, Maltepe and and E-5
junction at pendik districts |
| 02.11.1990 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Prefered
bus way costruction between Feyzipaşa Boulevard and Atatürk
Boulevard |
| 06.05.1991 |
KADIKÖY
MUNICIPALY ISTANBUL |
| Road
construction at old Üsküdar and Yelkenli değirmen Street |
| 13.12.199l |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| 1st
division pedestrian way arrangement construction at Istiklala
Street Beyoğlu |
| 01.12.1992 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
construction and wall repairing at Zincirlikuyu cemetery Şişli |
| 07.06.1993 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Reconstruction
of the road and broken down supporting wall at Emirgan - Istinye
way |
| 12.07.1993 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Main
artery road construction at Dudullu - İçerenköy Bostancı
line |
| 22.11.1993 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
repairing at the European side of Istanbul |
| 22.11.1993 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| Road
repairing at the Asian side of Istanbul |
| EREN
CONSTRACTIN CORPORATION |
| 03.11.1988 |
BEYOĞLU
MUNICIPALY ISTANBUL |
| 2nd
division of the unique road and channel construction |
| 12.09.1989 |
DEVISION
of HIGHWAY, REGION 1 MANAGEMENET KÜÇÜKYALI / IST. |
| Asphalt
repairing work in the 12th branch |
| 12.09.1989 |
KARAYOLLARI
l.BÖLGE MÜDÜRLÜĞÜ |
| 12.Şube
Dahilindeki Yollarda Asfalt Yama Yapılması İşi |
| 03.06.1996 |
BAKIRKÖY
MUNICIPALY ISTANBUL |
| Underpass
and surrounding junction organitions of Bakırköy - Yeşilköy
Railway |
| 02.07.1996 |
BAKIRKÖY
MUNICIPALY ISTANBUL |
| Asphalt
repairing and rubble collecting work at Bakırköy Region |
| 27.10.1996 |
BAKIRKÖY
MUNICIPALY ISTANBUL |
| 2nd
Subway and surrounding juntions organizations on Yeşilköy
Railway |
| 24.06.1997 |
BAKIRKÖY
MUNICIPALY ISTANBUL |
| Connecting
road construction between 10 Temmuz Street and Istanbul Street |
| 3l.12.1998 |
BAKIRKÖY
MUNICIPALY ISTANBUL |
| E-5
connecting roads and underpass ways contructions at Osmaniye, Bakırköy
/ ISTANBUL |
| 16.08.1999 |
ISTANBUL
METROPOLITAN MUNICIPALITY |
| E-5
subway and shared infrastructure construction at Avcılar /
ISTANBUL |